1
/
of
1
GE Mapress C-steel transition bend 90 Gr. with IG, d 42xRp11/2 (galvanized)VPE:1ST
GE Mapress C-steel transition bend 90 Gr. with IG, d 42xRp11/2 (galvanized)VPE:1ST
Regular price
€31,34 EUR
Regular price
€43,29 EUR
Sale price
€31,34 EUR
Unit price
/
per
Couldn't load pickup availability
Purposes
- For domestic technology, industry and
shipbuilding
Characteristics
- Unpressed leaky
- Sealing ring made of CIIR black
- Outside galvanized
- Including sheathing of the fitting
- with the Geberit sealing bandage black
- made of IIR butyl rubber.
- The installation guidelines of the
Manufacturer
- must be observed.
Technical characteristics
- Material: unalloyed steel 1.0034
E195 (EN 10305)
- Shape: Arch
- arc / angle (degrees): 90 degrees
- L / Length (cm): 8 cm
- d, D / outside diameter (mm): 42 mm
- DN / nominal diameter: 40
- Rp / internal pipe thread tapered ("):
1 1/2 "
Brand: Geberit
Type: Mapress C-steel
Article no.: 20561
form | Bow |
Connection 1 | Press sleeve |
Connection 2 | Other |
Surface protection connection 1 | Galvanic/electrolytically galvanized |
Treatment Surface 1 | Untreated |
Surface protection connection 2 | Galvanic/electrolytically galvanized |
Treatment Surface 2 | Untreated |
Locked | Yes |
With sealing material | Yes |
Nominal inner diameter connection 2 | 1 1/2 inch (40) |
With drain valve | No |
With vent | No |
Length connection 1 (mm) | 80.0 |
Transitional | No |
Nominal inner diameter connection 1 | DN40 |
System-bound | Yes |
Material connection 1 | Steel |
Material connection 2 | Steel |
Material quality connection 1 | St 34.2 (1.0034) |
Material grade connection 2 | St 34.2 (1.0034) |
Angle of the arc (°) | 90.0 |
Pipe outer diameter connection 1 (mm) | 42.0 |
Material Sealing | CIIR |
Contour Code | M |
Type across all | Bow |
Type Special | Transitional arch |
material | Galvanized steel |
Connection 1 | 42mm |
Connection 2 | "Rp11/2""" |
Length connection 2 (mm) | 84.0 |
Working length connection 1 (mm) | 50.0 |
Working length connection 2 (mm) | 63.0 |
degree | 90 |
Wall thickness connection 1 (mm) | 1.5 |
Delivery time approx. 2-3 weeks
Procurement goods!
Share
